Base Drive can carry out on-site load testing, including pull-out (tension) and compression testing, to verify foundation performance. This provides engineers with real site data to support design and PS4 sign-off.
Our screws are engineered to meet NZ Building Code requirements
We offer fast installation with no curing time
Our solutions are reusable and lower waste than concrete
Our screws are compatible with NZ engineering design and PS4 sign-off
Not because it sounds good — but because it is the only way to build something that lasts.
Need things done properly and on time?
Share your vision and site details. We’ll manage the full process — from ground preparation and structural support through to the finished deck — so you can focus on enjoying the result.